List of reports


Following project reports can be obtained from the coordinator.

D 1.1:
High pressure pipeline-system design for transporting and cleaning hydrogen from source to public refuelling station in industry park Hoechst by Infraserv.

D 1.4:
Cylinder packs pipe rack in Mantova.

D 1.5:
Report on experience during the first year of operation of the high pressure transport system in Rhein-Main.

D 1.7:
Report on experience during the second year of operation of the high pressure transport system in Rhein-Main.

D 1.8:
Report on the third year of operation of the high pressure transport system in Rhein-Main.

D 3.4:
H2 Production Facility

D 3.5:
SCT-CPO H2 production plant: OPERATING MANUAL

D 3.6:
Operational experience and assessment of the on-site H2 produktion facility in Mantova.

D 4.5:
Test certificates and operating manuals for equipment built for hydrogen compression, storage and distribution at the public refuelling station in Mantova.

D 4.6:
An approved infrastructure for compression, storage and distribution of hydrogen at the public refuelling station in Mantova.

D 4.7:
Licensing procedures and experience with obtaining approval of authorities for hydrogen infrastructure at both sites (Hoechst in Germany and Mantova in Italy) by Infraserv and Sapio

D 4.8:
Report on experience with hydrogen refuelling in the first year of operation in Rhein-Main.

D 4.9:
Documentation of the hydrogen quality delivered in Frankfurt and Mantova - month 36.

D 4.10:
Documentation of the hydrogen quality delivered in Frankfurt and Mantova - month 48.

D 4.11:
Report on experience with hydrogen refuelling in the second year of operation in Rhein-Main

D 4.13:
Documentation of the hydrogen quality delivered in Frankfurt and Mantova.

D 4.14:
Report on overall experience with Hydrogen refuelling infrastructure at Rhein-Main during the demonstation phase in Zero Regio.

D 4.15:
Report on overall experience with Hydrogen refuelling infrastructure at Mantova, Lombardia during the demonstation - month 63.

D 5.3:
Analysis communication concept of 700-bar refuelling (safety & reliability) by Daimler Chrysler

D 5.5:
Six monthly reports containing database on emission results.

D 5.7:
Report containing database on emission results (JRC) - month 63.

D 6.1:
Report on evaluation methods for data on vehicles & infrastructure.

D 6.3:
Final report on evaluation of infrastructure data from Frankfurt and Mantova.

D 6.5:
Report on final evaluation for both car fleets - month 63.

D 7.1:
Work plan document on competitiveness and external effects by Roskilde and IEFE-Bocconi.

D 7.2:
Work plan document on acceptance problems and mitigations strategies by Saviko.

D 7.3:
Work plan document on regulatory problems and strategy development by IEFE-Bocconi and Roskilde.

D 7.5:
Report on problems of acceptance, analysed prior to vehicle demonstration by Saviko.

D 7.6:
Report on taxation and subsidies in Southern Europe by IEFE-Bocconi.

D 7.7:
Report on taxation and subsidies in Northern Europe.

D 7.8:
SME-involvement and strategies to strengthen it.

D 7.9:
Final report on the potential contribution of Zero Regio hydrogen pathways to macro-economics goals.
D 7.9a
D 7.9b

D 7.10:
Policy lessons from the promotion of natural gas in Italy.

D 7.12:
Final report on business development.

D 7.16:
Technological trajectories in H2 cycle.

D 7.17:
Final report on acceptance.

D 7.18:
Economic impact of the introduction of new technical standards in transport sector to support the H2 demand.

D 7.19:
The future cost and competitiveness of hydrogen as a transport fuel in Europe.

D 7.20:
EU and national policies relevant to the introduction of fuell cell and hydrogen in automotive transport in Europe.

D 8.5
Status report on safety regulations for FCV’s in Italy before bringing them on road by CRF.

D 8.6:
Final report on safety and other regulations for FCV’s in Italy before bringing them on road.

D 8.7:
Vehicle Handbook for Italy – Final Release
D 8.7
Annex Panda Hydrogen use and maintenance handbook

D 8.8:
VdTÜV Leaflet Presentation.

D 9.1:
Project website.

D 9.2:
Zero Regio Brochures by Infraserv

D 9.3:
Zero Regio CD-Rom by Infraserv

D 9.4:
Project pocket book in Italian.

D 9.5:
Zero Regio Workshop proceedings.

D 9.6:
Project pocket book in English.

D 9.7:
Project final Conf. Proceedings.


Final reports:


Final summary of results.
Minutes of the final project conference.
Final socio-economic evaluations.



Copyright ©2007
ZeroRegio.com
All rights reserved

Co-funded by the European Commission